Visiting? Relocating? Check out the Torrance Advantage

 TORRANCE california

Public Works
------------
 | Del Amo Blvd Extension
-

font size: A | A | A

2.0 - Clarification and Modifications

The following clarifications and revisions are intended to update the Draft EIR/EA in response to the comments received during the public review period. These changes, in addition to the Draft EIR/EA and the Recirculated Draft EIR/EA, constitute the Final EIR/EA, to be presented to the City Council for certification and approval. 

The changes to the Draft EIR/EA are listed by section, page number, and the comment that brought about the change, if applicable.  Please refer to Section 3.0, Response to Comments, for comment letters and corresponding responses. 

Section 0.0  Executive Summary

Page Clarification/Revision
ES-16 A biological resources mitigation measure has been added to Table ES-1:

"Landscaping shall be provided along the Del Amo Boulevard extension, including the median and parkway.  Landscaping design will be consistent with the City General Plan and applicable City design guidelines. Low-water use or drought tolerant plants shall be used together with water efficient irrigation systems."

Section 3.10 Biological Resources

Page Clarification/Revision
3.10-11

The following sentence and mitigation measure have been added to Section 3.10, Biological Resources:

"The following mitigation measure shall be implemented in the design phase of the project."

"Landscaping shall be provided along the Del Amo Boulevard extension, including the median and parkway.  Landscaping design will be consistent with the City General Plan and applicable City design guidelines. Low-water use or drought tolerant plants shall be used together with water efficient irrigation systems."